Facebook
Categories

Items to be checked before operation of CNS Marine Crane

Items to be checked before operation of CNS Marine Crane
Oct 14th,2024 148 Views
1. Before CNS Marine crane operation: no-load operation, check whether all parts of the equipment are normal. Clamp the soft and soft change rope into place, and tighten the medium change rope. Carefully check the hook, wire rope, device, etc. on the equipment, if there are hidden dangers to clean up in time, before operation.
 
2. In the operation of CNS Marine crane: when lifting goods, the pre-lifting test should be carried out first, and then normal operation should be carried out after confirmation. In addition, its operators should also bear in mind the "ten no lifting" principle of lifting operations and strictly regulate ship lifting operations. Overload work is prohibited, special tools should be used for lifting and leveling machinery, and protective measures should be taken.
 
Booms (double booms) are not allowed without permission. Suspension hook front and running down the line do not ride the bullet train. The inside of the boat. Tilt no more than 3 degrees. Before handling the crane, it is necessary to coal the belt machine, and it can be moved after stopping, so as to check whether the control line of the door box is damaged. If the Marine crane is damaged, the electrician should be notified immediately.
 
3. After the operation of CNS Marine crane: first turn to the overhead belt machine, and then remove the coal pocket. Do lifting operations of the Marine crane, pay attention to the cart. Position the controller and cut off the power supply. In addition, the Marine crane operator should do the daily maintenance and maintenance of the crane to prepare for the next shift. Quickly cut off the power supply and place the switch box cable reel in the specified position.